Coatings
Imax Cinema, London
The job was to clean, repair and apply an anti-graffiti coating to all the subway and walkway walls and soffits around the Imax cinema, Waterloo, London.

Bethnal Green Road Anti-flyposting
Thanks to you and your staff for all their hard work. we know it will help tower hamlets be a cleaner and safer place to live and work

Soho Anti-flyposting
Over a period of three months, we cleaned every surface and applied our specially formulated Anti-Flyposting Coating.

Stirling anti-flyposting
“THE PROCESS MADE A GREAT IMPROVEMENT TO OUR STREETSCAPE – WITH NOT ONE INSTANCE OF FLYPOSTING IN THE YEAR AFTER THE WORK WAS COMPLETED. THE COMPANY WAS RELIABLE AND EFFICIENT AND WE HOPE TO EXTEND THE PROJECT TO A WIDER CIRCLE AROUND THE CENTRE IN THE NEAR FUTURE.”

Shoreditch anti-flyposting
Street furniture in the upwardly mobile Shoreditch Triangle had attracted more than its fair share of unwanted flyposting and graffiti. Main contractor Ringway Jacobs called Rhinoceros in to prepare and coat lightposts and street signs.

Dover Harbour Lighting Masts
“AN EXCELLENT JOB. THE COMPANY WERE SO CONSCIENTIOUS IN THEIR WORK METHODS AND SAFETY PROCEDURES. I’D HAVE NO PROBLEM IN USING THEM AGAIN, ALTHOUGH WITH A 12-YEAR GUARANTEE, I’D HOPE TO BE RETIRED THE NEXT TIME THESE POLES NEED REPAINTING.”

Notttingham Tram Poles
Overall I feel the performance was good. Dimitar kept me informed of issues arising and was constantly prepared to alter the plan to achieve completion
Wood Green Library
Application of the new concrete facade on the 5-storey Wood Green Library by a Rhinoceros team has been completed. The project required 64 tons of concrete to complete 638 square meters of facing.

Old Street Station Soffits
Old Street station underpass ceiling and soffitts were in poor shape early in 2011. A thorough refurbishment was required. RHINOCEROS were appointed by main contractor Ringway Jacobs and began work in April.