Concrete Repairs
Folkestone Viaduct
The Rhinoceros teams working on the iconic restoration at Folkestone Harbour, including viaduct and steel swing rail bridge, are now well advanced on coating of the bridge itself. Work on extensive brickwork repair to the viaduct is complete, as is blast cleaning and priming of the steel structure. An intermediate coat is now being applied.
Firs Lane Bridge
Rhino have completed repairs on a badly spalled and corroded T beam on the bridge carrying Firs Lane over the New River in Enfield.
Knights Lane Culvert
Inspection of a culvert beneath the site of the old Edmonton Town Hall (above), demolished in 1989, identified a number of areas of concrete spalling in the soffit and loss of mortar to brickwork.
Bricklayers Arms Overpass
Nesting pigeons caused added complications to the cleaning and degreasing of bearings for the Bricklayers Arms overpass in London SE1.
Kingsmere Retaining Wall
Rhinoceros completed work today on two retaining walls on the northern approach to the Kingsmere Pedestrian Subway on the A3 at Tibbets Corner.
Archway Retaining Wall
Rhinoceros complete the refurbishment of the retaining walls outside Archway Tube Station. A new capping was cast for the walls, spalled concrete and cracks were repaired using epoxy HB40 cement.