Kingsmere Retaining Wall
Rhinoceros completed work today on two retaining walls on the northern approach to the Kingsmere Pedestrian Subway on the A3 at Tibbets Corner. These walls prevent the erosion of the bank into the drainage channels and footpath. In the past pedestrians, joggers and cyclists have been unable to use the subway due to flooding caused by blocked drainage channels. These walls will keep the subway open to the public and eliminate the costs previously incurred in cleaning out the drainage channels.