Smeaton Road RSAD Bridge Phase Two

14 April 2023

The western span of this bridge has now been cleared of debris and guano, damaged paint coatings abraded back to clean steel and galvanised 2” steel mesh installed to all beams and flanges to keep pigeons off the ledges. This is a 30 metres span with 5 steel support beams.

Previous
Previous

Fore Street Culvert Cleaning

Next
Next

Smeaton Road RSAD Bridge