Smeaton Road RSAD Bridge Phase Two
14 April 2023
The western span of this bridge has now been cleared of debris and guano, damaged paint coatings abraded back to clean steel and galvanised 2” steel mesh installed to all beams and flanges to keep pigeons off the ledges. This is a 30 metres span with 5 steel support beams.